Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 764.4-2002 |
Cold forging hot dip galvanizing bolt and nut for tower and hardware of transmission lines |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1358-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 422-2015 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 834-2003 |
Guide for prevention of water and cool steam damage to steam turbines in fossil power plant |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1010.5-2006 |
High-voltage static VAR compensator Part 5:Closed-loop water cooling system |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 502.13-2006 |
Analytical methods of steam and water in power plants Part 13: Determination of phosphate (Spectrometric method) |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5139-2001 |
Specification for designing gas-insulation metal-enclosed switchgear of hydropower station |
660 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/Z 634.14-2005 |
Telecontrol equipment and systems-Part 1-4:General considerrations-Section 4:Basic aspects of telecontrol data transmission and organization of standards IEC 60870-5 and IEC 60870-6 |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5295-2013 |
|
4185 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL 438-1991 |
|
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5152-2001 |
Test code of water analysis for hydraulic concrete |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1306-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1373-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 785-2001 |
The guide of the secure technic for the pipeline in the middle temperature or the middle pressure in the fossil power plants |
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 659-1998 |
Code for on-line acceptance test of distributed control system in fossil fuel power plant |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1138-2009 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 727-2000 |
Guideline of operation and maintenance for current and voltage transformers |
585 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 5161.13-2002 |
Specification for construction quality checkout and evaluation of electric equipment installation Part 13:Power converter equipment |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1021-2006 |
Capacitance weir transducer |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 1112-2009 |
Verification code of verification equipment for AC&DC meter |
405 (USD) |
via email in
1-3 business day
|
VALID
|
|
|