Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 5216-2005 |
Design rule for 35kV~220kV urban under ground substation |
945 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 5718-2015 |
|
660 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 5176-2003 |
Design specification of prestressed anchorage for hydropower project |
1215 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL 5106-1999 |
Operation code of cross power transmission line in installing the conductor |
585 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 809-2002 |
Water quality -- Determination of turbidity |
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 860.72-2004 |
Communication networks and systems in substations Part 7-2: Basic communication structure for substation and feeder equipment -- Abstract communication service interfaces |
1845 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 644-1997 |
IPQ movable scraper trash remover |
150 (USD) |
via email in
1 business day
|
VALID
|
|
DL 405-1991 |
|
420 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL 647-2004 |
Inspection code for boiler and pressure vessel in thermal power plant |
1290 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 1325-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5138-2001 |
Technical specifications for aerial photographing and surveying of overhead transmission line |
1680 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 664-1999 |
Technical guide for infrared diagnosis of alive equipment |
495 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL 463-1992 |
|
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 502.12-2006 |
Analytical methods of steam and water in power plants Part 12: Determination of sulfate (Volumetric method) |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1360-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 912-2005 |
Quality criterion of water and steam for supercritical pressure units in fossil fuel power plant |
105 (USD) |
via email in
1-3 business day
|
|
|
DL/T 930-2005 |
Technical guide of the ultrasonic testing of turbine nonbore rotors |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5069-1996 |
|
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1098-2009 |
Requirements and tests for overhead line spacers |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 474.1-2006 |
Guide for insulation test on site insulation resistance、 dielectric absorption ratio and polarization index test |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|