Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
NB/T 14002.1-2015 |
Shale Gas Reservoir Stimulation Part1:Specification for Fracturing Design |
354 (USD) |
via email in
1 business day
|
VALID
|
|
NB/T 14002.4-2015 |
Shale gas reservoir stimulation Part 4:Recommended practice for the technology of combined pumping fracturing plug and perforation in horizontal well |
344 (USD) |
via email in
1 business day
|
VALID
|
|
NB/T 14002.3-2015 |
Shale gas reservoir stimulation Part 3:recycling and disposal methods of fracturing flowback water |
154 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6213-2016 |
Fluoroboric acid for acidizing |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 6119-2012 |
Instrument for system condition of pumping well |
270 (USD) |
via email in
1-3 business day
|
|
|
SY/T 5372-2005 |
Regulation for workover job and method of quality evaluation for zonal injection of injector |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5405-1996 |
|
330 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5825-2007 |
Procedures of temperature test by a electronic down-hole thermometer |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6300-1997 |
General specification of paraffin inhibition and removal agent for the use of oil production |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6740-2008 |
The calibration method of caliper |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5694-1995 |
Acid densifier CT1-6 for acidification |
90 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
SY/T 6596-2004 |
Recommended practice for produced -- water reinjection in gas field |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6572-2003 |
Evaluation methods of resin performance for sand control |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5755-1995 |
|
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6036-1994 |
|
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6904-2012 |
The calibration method of production well logging surface system |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5107-2005 |
Recommended practices on measuring the properties of water-based fracturing fluid |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5587.12-2004 |
Codes for conventional workover job -- Part 12: Fishing |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6080-1994 |
|
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6125-2006 |
Technology procedures for gas well testing gas producing and performance monitoring |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|