Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 5338-2000 |
Recommended practice for sand consolidation of strengthen borehole wall |
300 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6486-2000 |
Recommended opertional method for preventing of clay-swelling and fine-migration in acidizing of water injection well |
300 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6694-2007 |
Lifting technology designs for hydraulic piston pumps & jet pumps |
390 (USD) |
via email in
1-3 business day
|
|
|
SY/T 5971-1994 |
|
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6888-2012 |
|
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 0531-2012 |
Determination of particle size of suspended solid in oilfield injecting wate. Resistance induction method |
120 (USD) |
via email in
1-3 business day
|
|
|
SY/T 6570-2003 |
Regulations drafted for the lift technology design of oil-wells |
435 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5834-2007 |
Performance specifications and measuring methods of low-solid killing fluid |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5904-1993 |
|
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6484-2013 |
Recommended practices for operation,maintenance,surveillance and troubleshooting of gas-lift Installations |
1050 (USD) |
via email in
1-8 business day
|
VALID
|
|
SY/T 5587.5-2004 |
Codes for conventional workover job -- Part 5: Preparation of well bore for downhole operation |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5764-2007 |
General technical specifications of natural plant gum for fracturing |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6487-2000 |
Recommended practices for liquid CO2 huff and puff |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6528-2002 |
Test method of the rock dielectric constant |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6334-2013 |
Acidizing designment,treatment and evaluation for production well and water injection well |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6743-2008 |
The caliration method of gamma-ray tool |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6645-2006 |
Regulations drafted for the injection and production well of perforated completion design of the underground gas storage about the depleted sandstone reservoir |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5556-1992 |
|
675 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 5674-1993 |
|
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY 5412-1991 |
|
375 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|