code of china Chinese Classification Professional Classification ICS Classification Latest News

LoginRegister
Position: Standard Search VALID TO BE VALID SUPERSEDED TO BE SUPERSEDED ABOLISHED TO BE ABOLISHED
Standard No. Title Price(USD) Delivery Status Add To Cart
SY/T 5338-2000 Recommended practice for sand consolidation of strengthen borehole wall (USD) via email in 1-3 business day ABOLISHED
SY/T 6486-2000 Recommended opertional method for preventing of clay-swelling and fine-migration in acidizing of water injection well (USD) via email in 1-3 business day ABOLISHED
SY/T 6694-2007 Lifting technology designs for hydraulic piston pumps & jet pumps (USD) via email in 1-3 business day
SY/T 5971-1994 (USD) via email in 1-3 business day ABOLISHED
SY/T 6888-2012 (USD) via email in 1-3 business day VALID
SY/T 0531-2012 Determination of particle size of suspended solid in oilfield injecting wate. Resistance induction method (USD) via email in 1-3 business day
SY/T 6570-2003 Regulations drafted for the lift technology design of oil-wells (USD) via email in 1-3 business day ABOLISHED
SY/T 5834-2007 Performance specifications and measuring methods of low-solid killing fluid (USD) via email in 1-3 business day ABOLISHED
SY/T 5904-1993 (USD) via email in 1-3 business day ABOLISHED
SY/T 6484-2013 Recommended practices for operation,maintenance,surveillance and troubleshooting of gas-lift Installations (USD) via email in 1-8 business day VALID
SY/T 5587.5-2004 Codes for conventional workover job -- Part 5: Preparation of well bore for downhole operation (USD) via email in 1-3 business day ABOLISHED
SY/T 5764-2007 General technical specifications of natural plant gum for fracturing (USD) via email in 1-3 business day VALID
SY/T 6487-2000 Recommended practices for liquid CO2 huff and puff (USD) via email in 1-3 business day ABOLISHED
SY/T 6528-2002 Test method of the rock dielectric constant (USD) via email in 1-3 business day VALID
SY/T 6334-2013 Acidizing designment,treatment and evaluation for production well and water injection well (USD) via email in 1-3 business day VALID
SY/T 6743-2008 The caliration method of gamma-ray tool (USD) via email in 1-3 business day ABOLISHED
SY/T 6645-2006 Regulations drafted for the injection and production well of perforated completion design of the underground gas storage about the depleted sandstone reservoir (USD) via email in 1-3 business day ABOLISHED
SY/T 5556-1992 (USD) via email in 1-5 business day ABOLISHED
SY/T 5674-1993 (USD) via email in 1-3 business day ABOLISHED
SY 5412-1991 (USD) via email in 1-3 business day ABOLISHED
About Us | Contact Us | Terms of Service | Privacy | Cancellation & Refund Policy | Payment
Tel:+86-10-8572 5655 Fax:+86-10-8581 9515 Email: coc@codeofchina.com QQ: 672269886
Copyright:TransForyou Co., Ltd. 2008-2020