code of china Chinese Classification Professional Classification ICS Classification Latest News

LoginRegister
Position: Standard Search VALID TO BE VALID SUPERSEDED TO BE SUPERSEDED ABOLISHED TO BE ABOLISHED
Standard No. Title Price(USD) Delivery Status Add To Cart
SD 166-1985 Requirements for Preparation of Environmental Impact Assessment Report in Site Selection Stage of Nuclear Power Station via email in 1 business day VALID please email coc@codeofchina.com for quotation
DL 5004-1991 Standard for design of thermal process automation laboratory of fossil fuel power plants (USD) via email in 1-3 business day ABOLISHED
GB/T 50964-2014 via email in VALID please email coc@codeofchina.com for quotation
SDGJ 2-1985 (USD) via email in 1-5 business day ABOLISHED
GB/T 50619-2010 Code for designing of thermal power plants seawater desalination system via email in VALID please email coc@codeofchina.com for quotation
DL/T 561-1995 Guide for Chemical Supervision of Water and Steam in Thermal Power Plants (USD) via email in 1-3 business day ABOLISHED
DL/T 5035-1994 Technical Standard on Heating Ventilation and Air Conditioning Design for Thermal Power Plant (USD) via email in 1-10 business day ABOLISHED
DL/T 5161.12-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 12:Low-voltage apparatus (USD) via email in 1-3 business day ABOLISHED
DL/T 552-1995 The testing code of dry cooling tower and condenser of thermal power plant (USD) via email in 1-5 business day ABOLISHED
DL/T 5190.5-2004 The specification of erection and acceptance of electric power constrution Part5: Section of instrumentation and control (USD) via email in 1-10 business day ABOLISHED
GB 50049-1994 Code for design of small-size power plant (USD) via email in 1-10 business day
DL/T 5226-2005 Technical rule for designing network computerized monitoring and control system in fossil fuel power plant (USD) via email in 1-8 business day ABOLISHED
DL/T 5052-1996 Standard for auxiliary ancillary living and welfare buildings area for fossil fuel power plant (USD) via email in 1-3 business day ABOLISHED
DL/T 5187.1-2004 Technical coal for designing coal handling of fossil fuel power plant Part 1:Coal handling system (USD) via email in 1-10 business day ABOLISHED
SD 252-1988 (USD) via email in 1-5 business day VALID
DL/T 5054-1996 Code for design of thermal power plant steam/water piping (USD) via email in 1-10 business day ABOLISHED
DL/T 5024-1993 (USD) via email in 1-10 business day ABOLISHED
DL 5022-1993 Technical stipulation for the design of civil structure of thermal power plant (USD) via email in 1-10 business day
DL/T 520-1993 (USD) via email in 1-3 business day ABOLISHED
DL/T 5161.2-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 2:High voltage electric power equipment (USD) via email in 1-3 business day ABOLISHED
About Us | Contact Us | Terms of Service | Privacy | Cancellation & Refund Policy | Payment
Tel:+86-10-8572 5655 Fax:+86-10-8581 9515 Email: coc@codeofchina.com QQ: 672269886
Copyright:TransForyou Co., Ltd. 2008-2020