Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 4804-1992 |
Codefor submarine pipeline Systems |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY/T 4802-1992 |
Recordak recommended practice for planning designing and constructing fixed offshore platforms |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY 4200-2007 |
Code for quality acceptance of oil and gas construction engineering General rule |
285 (USD) |
via email in
1-3 business day
|
VALID
|
|
SYJ 3-1991 |
|
1725 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SY/T 6849-2012 |
Design code of structures for the road of allow over water and the well field in beach-shallow sea |
765 (USD) |
via email in
1-8 business day
|
VALID
|
|
SY/T 6770.4-2012 |
Quality acceptance code of non-metalic pipes—Part4:Steel skeleton reinforced plastic coiled composite pipes |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 0053-2004 |
Standard for oil and gas field and pipeline investigation of geotechnical engineering |
1290 (USD) |
via email in
1-10 business day
|
|
|
SY/T 4811-1992 |
Recommended method for classification of locations for electrical installations at drilling rigs and production facilities on marine fixed and mobile platforms |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY/T 0048-2009 |
Design specifications of general plan for petroleum and natural gas engineering |
675 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY 0466-1997 |
Specification for construction and acceptance of collection and transportation pipeline of natural gas |
465 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SYJ 18-1986 |
|
555 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SYJ 29-1987 |
|
105 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SH/T 3171-2011 |
Technical specification of flexible coupling in petrochemical engineering |
255 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 4812-1992 |
Guide for pressure-relieving and depressuring systems |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY/T 6772-2009 |
Code of Design for Gas Protection Station |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 0077-1993 |
Design specification of natural gas liquid recovery |
1000 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 10050-2004 |
The specification of environment conditions and environmental loads |
750 (USD) |
via email in
1-5 business day
|
VALID
|
|
SYJ 4041-1989 |
|
765 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
GB/T 50933-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 6769.2-2010 |
Specifications for the design,construction and acceptance of non-metallic pipelines—Part 2:Steel framed polyethylene composite pipes |
330 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|