code of china Chinese Classification Professional Classification ICS Classification Latest News

LoginRegister
Position: Standard Search VALID TO BE VALID SUPERSEDED TO BE SUPERSEDED ABOLISHED TO BE ABOLISHED
Standard No. Title Price(USD) Delivery Status Add To Cart
SY/T 4804-1992 Codefor submarine pipeline Systems via email in ABOLISHED please email coc@codeofchina.com for quotation
SY/T 4802-1992 Recordak recommended practice for planning designing and constructing fixed offshore platforms via email in ABOLISHED please email coc@codeofchina.com for quotation
SY 4200-2007 Code for quality acceptance of oil and gas construction engineering General rule (USD) via email in 1-3 business day VALID
SYJ 3-1991 (USD) via email in 1-10 business day ABOLISHED
SY/T 6849-2012 Design code of structures for the road of allow over water and the well field in beach-shallow sea (USD) via email in 1-8 business day VALID
SY/T 6770.4-2012 Quality acceptance code of non-metalic pipes—Part4:Steel skeleton reinforced plastic coiled composite pipes (USD) via email in 1-3 business day VALID
SY/T 0053-2004 Standard for oil and gas field and pipeline investigation of geotechnical engineering (USD) via email in 1-10 business day
SY/T 4811-1992 Recommended method for classification of locations for electrical installations at drilling rigs and production facilities on marine fixed and mobile platforms via email in ABOLISHED please email coc@codeofchina.com for quotation
SY/T 0048-2009 Design specifications of general plan for petroleum and natural gas engineering (USD) via email in 1-5 business day ABOLISHED
SY 0466-1997 Specification for construction and acceptance of collection and transportation pipeline of natural gas (USD) via email in 1-5 business day ABOLISHED
SYJ 18-1986 (USD) via email in 1-5 business day ABOLISHED
SYJ 29-1987 (USD) via email in 1 business day SUPERSEDED
SH/T 3171-2011 Technical specification of flexible coupling in petrochemical engineering (USD) via email in 1-3 business day VALID
SY/T 4812-1992 Guide for pressure-relieving and depressuring systems via email in ABOLISHED please email coc@codeofchina.com for quotation
SY/T 6772-2009 Code of Design for Gas Protection Station (USD) via email in 1-3 business day VALID
SY/T 0077-1993 Design specification of natural gas liquid recovery (USD) via email in 1 business day SUPERSEDED
SY/T 10050-2004 The specification of environment conditions and environmental loads (USD) via email in 1-5 business day VALID
SYJ 4041-1989 (USD) via email in 1 business day SUPERSEDED
GB/T 50933-2013 via email in VALID please email coc@codeofchina.com for quotation
SY/T 6769.2-2010 Specifications for the design,construction and acceptance of non-metallic pipelines—Part 2:Steel framed polyethylene composite pipes (USD) via email in 1-3 business day ABOLISHED
About Us | Contact Us | Terms of Service | Privacy | Cancellation & Refund Policy | Payment
Tel:+86-10-8572 5655 Fax:+86-10-8581 9515 Email: coc@codeofchina.com QQ: 672269886
Copyright:TransForyou Co., Ltd. 2008-2020