Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
沪S/T 305-2000 |
|
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
HG/T 20544-1992 |
Technical specification of erection of structure parts for chemical furnace |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
沪S/T 104-2002 |
|
405 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
HG/T 20637.6-1998 |
Preparation of instrumentation specification |
1620 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SY/T 0468-2000 |
Standard for inspection and evaluation of petroleum construction engineering anti-corrosion and thermal insulation steel pipe |
1080 (USD) |
via email in
1-8 business day
|
|
|
SY 4070-1993 |
Standard for Construction and Acceptance of Oil and Gas Pipeline Overheadcrossing Project |
945 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
SY/T 4106-2005 |
Technical standard of non-solvent polyurethane Internal and external coating for pipeline |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY 0470-2000 |
Standard for construction and acceptance of oil and gas pipeline overhead crossing project |
885 (USD) |
via email in
1-8 business day
|
|
|
SJ/T 31450-1994 |
|
60 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
HG/T 20636.9-1998 |
Checking list for review and approval for engineering design of instrumentation |
285 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 0315-2005 |
Technological standard of FBE external fusion bonded epoxy coating for steel pipeline |
435 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 0452-2002 |
Standard for weld procedure qualification of oil and gas metal pipeline |
810 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
HG/T 20637.5-1998 |
Preparation of instrumentation requisition |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GBJ 235-1982 |
Specifications for construction and acceptance of ventilation and air-conditioning work |
1515 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
GB 50185-1993 |
Standard for inspection and evaluation of thermal insulating work of industrial equipment and pipeline |
555 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY 0402-2000 |
Standard for construction and acceptance of oil and natural gas station procedure pipeline project |
870 (USD) |
via email in
1-8 business day
|
|
|
HG/T 20637.4-1998 |
Preparation of requirements for instrumentation construction and erection |
420 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
Q/CNPC 93-2003 |
|
540 (USD) |
via email in
1-5 business day
|
VALID
|
|
HG/T 20549.4-1998 |
|
225 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 0444-1998 |
Technical standards for magnetic particle test of welded atmospheric steel storage tanks and pipelines |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|