Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
HG/T 20636.6-1998 |
Task for engineering design of instrumentation |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 16805-2017 |
The pressure testing of steel pipelines for the transportation of petroleum,gas and highly volatile liquids |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
沪S/T 202-2000 |
|
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
HG/T 20679-2014 |
Design Code for External Corrosion Protection of Chemical Equipment and Piping |
620 (USD) |
via email in
1 business day
|
VALID
|
|
LD/T 76.10-2000 |
Work quota for the ventilation work of chemical engineering |
675 (USD) |
via email in
1-5 business day
|
VALID
|
|
FJJ 211-1986 |
|
630 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SH 3502-2000 |
Code for construction and acceptance of titanium piping |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY 4208-2008 |
Code for quality acceptance of oil and gas construction engineering oil and gas transmission pipeline project |
915 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
HG/T 21540-1992 |
|
3090 (USD) |
via email in
1-10 business day
|
VALID
|
|
SH/T 3522-1991 |
|
960 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
SH 3506-2000 |
Specification for construction and acceptance for installation work of tubular fired heater |
570 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
LD/T 76.7-2000 |
Work quota for the welding and cutting and non-destructive test of chemical engineering |
405 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 50184-1993 |
Standard for checking and evaluating the quality of industrial metallic piping |
885 (USD) |
via email in
1-8 business day
|
|
|
GB/T 31032-2014 |
Welding and acceptance standard for steel pipings and pipelines |
1500 (USD) |
via email in
1-10 business day
|
VALID
|
|
CECS 206-2006 |
Technical specification for steel jacket pre-insulated pipeline with vacuum layer |
570 (USD) |
via email in
1-5 business day
|
VALID
|
|
HG/T 20637.7-1998 |
Materials take-off of instrumentation |
600 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
HG/T 20639.1-1998 |
Typical sheets for engineering design of instrumentation |
2790 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SJ/T 31451-1994 |
Requirements of Readiness and Methods of Inspection and Assessment for Compressed Air Pipelines |
184 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
SY/T 0325-2001 |
Steel pipelines crossing railroads and highways |
660 (USD) |
via email in
1-5 business day
|
|
|
HG/T 20636.4-1998 |
Split of design work between instrumentation and electricity |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
|