code of china Chinese Classification Professional Classification ICS Classification Latest News

LoginRegister
Position: Standard Search VALID TO BE VALID SUPERSEDED TO BE SUPERSEDED ABOLISHED TO BE ABOLISHED
Standard No. Title Price(USD) Delivery Status Add To Cart
GB/T 34350-2017 (USD) via email in 1-5 business day VALID
CJ/T 189-2004 Plastic-steel mesh skeleton-plastic (PE) composite pipe via email in 1-3 business day please email coc@codeofchina.com for quotation
T/CFA 02010202-3-2013 The code for construction and acceptance of water and sewerage ductile iron pipeline works Specification requirement via email in VALID please email coc@codeofchina.com for quotation
DB31/T 1162-2019 (USD) via email in 1-5 business day VALID
GB/T 37701-2019 Corrosion resistant alloy clad or lined steel pipe for petroleum and natural gas industries (USD) via email in 1-5 business day VALID
DL/T 991-2006 Spectral analysis guideline of metal for electrical power equipment (USD) via email in 1-3 business day VALID
GB 50235-1997 Code for construction and acceptance of industrial metallic piping (USD) via email in 1-8 business day ABOLISHED
GB/T 28799.3-2012 Plastics piping systems for hot and cold water installations - Polyethylene of raised temperature resistance (PE-RT) - Part 3: Fittings via email in VALID please email coc@codeofchina.com for quotation
GB 50264-1997 Design code for insulation engineering of industrial equipment and pipe (USD) via email in 1-5 business day ABOLISHED
GB/T 34349-2017 (USD) via email in 1-3 business day VALID
GB 50236-1998 Code for construction and acceptance of field equipment, industrial pipe welding engineering (USD) via email in 1-10 business day ABOLISHED
GB/T 36676-2018 External inspection methodology of stress corrosion cracking(SCC)forburied steel pipelines (USD) via email in 1-3 business day VALID
GB/T 34346-2017 (USD) via email in 1-5 business day VALID
DL/T 883-2004 Technical guide of remote fielding eddy inspecting for steel tubes of in-service feedwater booster in power plants (USD) via email in 1-3 business day VALID
DL/T 515-2004 Pipe bends for power station (USD) via email in 1-3 business day ABOLISHED
About Us | Contact Us | Terms of Service | Privacy | Cancellation & Refund Policy | Payment
Tel:+86-10-8572 5655 Fax:+86-10-8581 9515 Email: coc@codeofchina.com QQ: 672269886
Copyright:TransForyou Co., Ltd. 2008-2020