Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 728-2000 |
Technical guide for the order of gas-insulated metal-enclosed switchgear |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 822-2002 |
Code of test and adcceptance of monitoring and control system for hydropower plants |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 435-2004 |
Code for the prevention of pulverized coal firing furnace explosions/implosions in power plant boilers |
375 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 502.26-2006 |
Analytical methods of steam and water in power plants Part 26: Determination of ferrite (Spectrometric method using bathophenanthorline) |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 849.3-2004 |
General technical specification of test instruments used for power equipments Part 3: Route test instrument for power cable |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1374-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 861-2004 |
Basic vocabulary of electric power reliability |
765 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 781-2001 |
High frequency switching converter module in power system |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 793-2001 |
Reliability evaluation code for generating equipment |
720 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 5141-2001 |
Specifications for design of steel penstocks of hydroelectric stations |
2280 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 823-2002 |
General specification for microprocessor-based inverse time overcurrent protection equipment |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL 406-1991 |
|
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5095-2013 |
Technical Code for Design Load of Main Building in Fossil-fired Power Plant and the Conventional Island of Nuclear Power Plant |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1332-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 589-1996 |
Directives of thermal instrumentation and control for coal fired boiler in power plant |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL 5713-2014 |
|
1050 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 949-2005 |
Standard for joint plastic sealant of hydraulic structure |
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5144-2001 |
Specifications for hydraulic concrete construction |
1050 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 5461.2-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 675-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
|