Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 1403-2015 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL 5073-2000 |
Specifications for seismic design of hydraulic structures |
750 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 5204-2005 |
Code for oil/gas piping design of fossil fuel power plant |
1905 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 5378-2007 |
Design specifications for rural resident relocation planning of hydroelectric project |
465 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 998-2006 |
Performance test code for wetlimestonegypsum flue gas desulphurization |
60 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5015-1996 |
Specification on energy economy design of water resources and hydroelectric projects |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 788-2001 |
All dielectric self-supporting optical fiber cable |
435 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 866-2015 |
Code for selection and calculation of curren transformer and voltage transformer |
2985 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 487-2000 |
The distribution voltage along insulator string on A.C. overhead transmission line with rated voltage of 330kV and 550kV |
75 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5409.1-2009 |
|
|
via email in
|
|
please email coc@codeofchina.com for quotation
|
DL/T 591-1996 |
Directives of thermal instrumentation and control for turbo-generator in power plant |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 596-1996 |
|
1020 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 5156.1-2002 |
Electric power engineering surveying drawings |
705 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 5171-2002 |
Technical regulation for hydrogeological drilling of electrical power engineering |
510 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 846.4-2004 |
General technical specifications for high voltage test equipments Part 4: Partial discharge detector |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 728-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 774-2001 |
Guide for operation and maintenance of distributed control system in fossil fuel power plant |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 790.4511-2006 |
Distribution automation using distribution line carrier systems-Part 4-511:Data communication protocols-systems management-CIASE protocol |
390 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1024-2015 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 748.8-2001 |
Guide of maintenance of boiler unit for thermal power station Part 8 : The maintenance of air preheater |
450 (USD) |
via email in
1-3 business day
|
VALID
|
|
|