Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 5013-2005 |
Code of operation in drilling for hydropower and hydraulic engineering |
1710 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL 425.1-1991 |
|
45 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 748.6-2001 |
Guide of maintenance of boiler unit for thermal power station Part 6 : the maintenance of precipitator |
255 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1036-2006 |
Patrol system for power transformation facilities |
330 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1031-2006 |
Quality standard of generator oils in service |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5483-2013 |
|
600 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 675-1999 |
Examination code for qualification of non-destructive testing personnel of electric power industry |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 893-2004 |
Steam turbine terminology of power plant |
1065 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 557-2005 |
Insulators of ceramic or glass material overhead lines with a nominal voltage greater than 1000V -- impulse puncture tests in air |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1307-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/Z 790.52-2005 |
Distribution automation using distribution line carrier system-Part 5-2:Lower layer profilers-Frequency shift keying(FSK) profile |
435 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1382-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5342-2006 |
Construction technology guidance for the assembling and erection of the steel towers of 750k V overhead transmission line |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1023-2006 |
Technical specification for substation training simulator |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5716-2015 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1033.4-2006 |
Electric power standard thesaurus part.4 Fossil-fired power plants |
615 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 570-1995 |
|
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL 5017-1993 |
Specifications for manufacture installation and acceptance of steel penstocks |
495 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 5220-2005 |
Code for designing over-head distribution transmission line up to 10kV |
990 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 1351-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
|