Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 860.92-2006 |
Communication networks and systems in substations-Part 9-2:Specific communication service mapping(SCSM)-Sampled values over ISO/IEC 8802-3 |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 656-1998 |
Code for on-line acceptance test of turbine control system in fossil fuel power plant |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 411-1991 |
|
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 649-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 469-1992 |
|
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 758-2009 |
Splicing fittings |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5010-2005 |
Code for engineering geophysical exploration of hydropower and water resources |
2970 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL 543-1994 |
Quality inspection standard for water treatment equipment used in powerplant |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 692-2008 |
Electric power trade urgently saving work rules |
300 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5381-2007 |
Design specifications for cleaning of reservoir zone of hydroelectric project |
330 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5221-2005 |
Technical rule for design of urban power cables |
1380 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 5700-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1401-2015 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5366-2006 |
Technical code for calculating steam/water piping stress in fossil power plants code for designing |
1275 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DLJS 2-9-1981 |
|
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 609-1996 |
Guide for 300MW grade steam turbine operation |
525 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 5161.6-2002 |
Specification for construction quality checkout and evaluation of electric equipment installation Part 6:Earthing device |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 594-1996 |
Specification for industrial rigid laminated sheets based on thermosetting resins for HV switchgear |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 502.14-2006 |
Analytical methods of steam and water in power plants Part 14: Determination of copper (Spectrometric method using dicyclohexanoneoxalyldihydrazone) |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5356-2006 |
Code for coarse -graied soid tests for hydropower and water conservancy engineering |
675 (USD) |
via email in
1-5 business day
|
VALID
|
|
|