Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 474.6-1992 |
|
220 (USD) |
via email in
1 business day
|
|
|
DL/T 999-2006 |
The gradational standard of spheroidizition for 2.25Cr-1Mo steel used in power plant |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1397.3-2014 |
General specification for DC power system test equipments of electric power system-Part 3:Testing system of the charging device characteristics |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 931-2005 |
The rule of physico-chemical personnel qualification in electric power industry |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5224-2005 |
Technical rule for the design of HVDC earth return operation system |
1500 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 5377-2007 |
Specifications for drawing-up of boundary line of land requisition and treatment of hydroelectric project |
450 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5492-2014 |
Technical Code for Remote Sensing Survey of Electric Power Engineering |
720 (USD) |
via email in
1 business day
|
VALID
|
|
DL/T 5156.3-2002 |
Electric power engineering surveying drawings Part 3:Hydrometeorology |
510 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 624-1997 |
Technical specifications of test equipment based on micro-computer for relaying protection |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1291-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 456-1991 |
|
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 564-1995 |
Ripple control receiver for load control |
315 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5065-1996 |
Rule for design of computerized monitoring and control system in hydraulic powerplants |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 622-1997 |
Technical specifications of elastic metal-plastic segment for thrust bearings of vertical-shaft hydrogenerators |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 518.1-1993 |
|
45 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DLGJ 17-1981 |
|
795 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 1100.1-2009 |
Time synchronism systems of power system Part 1:Technical specifications |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5472-2013 |
Guidelines for item segregation of construction budget for overhead transmission line projects |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1257-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1466-2015 |
|
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
|