Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL 5014-1992 |
Technical regulation for designing of reactive power compensation equipment for 330~500 kV substations |
1170 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 712-2000 |
Guideline for the selection of condenser tube materials in power plant |
300 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5113.11-2005 |
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 11:Bulb turbine and generator units installation engineering |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 685-1999 |
Basic requirements inspection specification and determination methods of conductor stringing sheave |
75 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5125-2001 |
Code for construction and rockmass testing borehole for hydroelectric and water resource geotechnial projects |
1110 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 1146-2009 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5156.1-2015 |
Standard of electric power engineering surveying drawing Part 1:surveying |
1140 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 455-1991 |
|
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5495-2015 |
|
1155 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 1328-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL 437-1991 |
|
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 464.5-1992 |
|
45 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1312-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 995-2006 |
Testing Regulations on Protection and Stability Control Equipment |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 5498-2015 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL 419-1991 |
|
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1474-2015 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 993-2006 |
General specification for power system out-of-step separation equipment |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 802.4-2007 |
Technical requirements for electric cable conduits Part 4:Double wall corrugated cable conduits of chlorinated polyvinyl chloride and unplasticized polyvinyl chloride |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1117-2009 |
The specification of welding procedure qualification for Conventional Island of nuclear power station |
615 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
|