Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 5210.8-2009 |
Code for construction quality acceptance and evaluation of electric power construct Part 8: Processing preparatio |
1485 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 5085-1999 |
Code for design of steel-concrete composite structure |
945 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 860.73-2004 |
Communication networks and systems in substations Part 7-3: Basic communication structure for substation and feeder equipment -- Common data classes |
855 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 5116-2000 |
Design guide of construction planning of rolled earthrock dam for hydropower and water conservancy project |
330 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 726-2000 |
Specification of voltage transformer for electrical power for order |
555 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 700.2-1999 |
Power goods and materials code Part 2 mechanical and electrical products |
870 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 1131-2009 |
System Test Standard for ±800kV HVDC Project |
480 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 725-2000 |
Specification of current transformer for electrical power for order |
480 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 799.3-2002 |
Labour environment monitoring technological specification of eletric power industry Part 3: Monitoring of indstrial noise |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 646-1998 |
Technical specification of manufacturing steel transmission pole structures |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1084-2008 |
Noise limits and measurement method of wind power plant |
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL 488-1992 |
|
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL 490-1992 |
|
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5046-2006 |
Technical code for the design of waste water treatment of fossil fuel power plants |
720 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 805.1-2002 |
Guideline for cycle chemistry in fossil plants -- Part 1: Guideline for feed-water oxygenated treatment of once-through boiler |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1398.34-2014 |
|
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5374-2008 |
Regulation for content and depth of pre-feasibility study Report of fossil fuel power plant |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5129-2001 |
Specifications for rolled earth-rockfill dam construction |
840 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 1310-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5113.1-2005 |
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 1:Civil department |
2250 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
|