Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 1477-2015 |
|
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5046-1995 |
Technical code for the design of waste water treatment of fossil fuel power plant |
795 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 1448-2015 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1318-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 600-1996 |
|
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 820-2002 |
The code of ultrasonic inspection section for butt welds of pipes |
450 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 603-2006 |
Regulation of operation and preventive maintenance for gas-insulated metal-enclosed switchgear |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 748.2-2001 |
Guide of maintenance of boiler unit for thermal power station Part 2 : The maintenance of boiler proper |
435 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 776-2001 |
Technical requirements for insulation material of thermal power plants |
255 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 849.1-2004 |
General technical specification of test instruments used for power equipments Part 1: Fault flashover test instrument for power cable |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5198-2004 |
Code for the construction of crane girders anchored to rock face for hydropower and water resources projects |
405 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 872-2004 |
Specification of single phase earthed relay in non-effective earthed power system |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 792-2001 |
Operation code of governors and pressure oil supply units for hydraulic turbines |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1408-2015 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 711-1999 |
Test guide of steam turbine governing system |
375 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1082-2008 |
Technical requirement of high voltage laboratory |
225 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1069-2007 |
Repair guideline of conductor and earth wire for overhead transmission line |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5388-2007 |
Code of natural building material investigation for hydropower and water resources project |
1950 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 759-2001 |
Link fittings |
330 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 662-2009 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
|