Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 721-2000 |
Remote terminal unit of distribution automation system |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1067-2007 |
Fundamental technical specifications for evaporative cooling hydrogenerator (generator/motor) |
270 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5397-2007 |
Specification for construction planning of hydropower engineering |
4275 (USD) |
via email in
1-10 business day
|
VALID
|
|
DLGL 16-1980 |
Technical Requirements for Design of Thermal Automation of Thermal Power Plant (on Trial) |
|
via email in
1 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 472-1992 |
|
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 709-1999 |
Technical code of safety inspection for steel penstocks |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5371-2007 |
Technical code of safety for hydroelectric and hydraulic civil construction engineering |
1650 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 708-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 799.7-2002 |
Labour environment monitoring technological specification of eletric power industry Part 7: Monitoring of very low frequency electromagnetic fields |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5480-2013 |
|
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 947-2005 |
The series and type spectrum of monitoring instrument for earth-rockfill dams |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5134-2001 |
Design guide of construction transportation for hydropower and water conservancy project |
480 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 403-2000 |
HV vacuum circuit-breaker for rated voltage 12kv to 40.5kv |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 748.10-2001 |
Guide of maintenance of boiler unit for thermal power station Part 10 : The maintenance of fossil-fired PP FGD equipment |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5343-2006 |
Construction technology guidance for tension stringing of 750k V overhead transmission line |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 5156.4-2002 |
Electric power engineering surveying drawings Part 4:Hydrogeology |
675 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 1359-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 587-1996 |
Code for operating management of microprocessor-based relaying protection equipment |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 445-2002 |
Specification for large and medium hydraulic turbine |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5214-2005 |
Technical specification for vibroflotation ground treatment of hydroelectric and water resources projects |
600 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
|