Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 814-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL 5006-1992 |
Specification for rock test of water resources and hydropower development (supplement port ) |
3450 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 768.7-2002 |
Manufacture quality specification for electric power fittings hot dip galvanized coatings on fabricated iron and steel articles |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5425-2009 |
|
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DLJS 2-10-1981 |
|
630 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 859-2004 |
Artificial pollution tests on composite insulators used on high-voltage AC systems |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 771-2001 |
Guide for selecting ion exchange resins used in water treatment of thermal power plant |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5062-1996 |
Design technical rules for transmission of protection information on radiolink system |
270 (USD) |
via email in
1-3 business day
|
|
|
DL/T 5338-2006 |
Technical code of karst engineering geological investigation for hydropower and water resources project |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 958-2005 |
Terminology of fuel for power plant |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 789-2001 |
Implementation & acknowledgement of auto-dispatching system rooted in country power network |
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1485-2015 |
|
330 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/Z 790.54-2004 |
Distribution automation using distribution line carrier systems- Part 5-4: Lower layer profilers- Multi-carrier modulation (MCM) profile |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 502.16-2006 |
Analytical methods of steam and water in power plants Part 16: Determination of ammonia (Spectrometric method using nessler reagent) |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 606.5-1996 |
Guide for water balance of thermal power plant |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 959-2014 |
The code of safety valves for power station boilers |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 499-2001 |
The rural low-voltage electric power technical code |
840 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 929-2005 |
Determination of the content in insulating oil and lubricating oil by infrared spectrum method |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 515-2004 |
Pipe bends for power station |
330 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 413-2006 |
Technical requirements of heat shrinkable accessories for power cable with rated voltages up to 35kV(Um=40.5kV) |
225 (USD) |
via email in
1-3 business day
|
VALID
|
|
|