Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 1301-2012 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5437-2009 |
Code for fossil power construction project from the unit commissioning to completed acceptance |
510 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 1326-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 837-2003 |
Reliability evaluation code for transmission and distribution installation |
420 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 688-1999 |
Intertripping equipment for power system |
255 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 502.23-2006 |
Analytical methods of steam and water in power plants Part 23: Determination of chemical oxygen demand (Potassium dichromate method) |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL 483-1992 |
|
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 923-2005 |
Specification of check valves for thermal power plant |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 579-1995 |
|
255 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 514-1993 |
|
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1450-2015 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1035.4-2006 |
Guidelines for the Maintenance of Circulating Fluidized Bed Boilers Part4: The maintenance of bottom ash discharge system |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL 487-1992 |
|
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 246-2006 |
Guideline of chemical supervision |
555 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 1137-2009 |
Vibrating wire earth pressure cell |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5161.1-2002 |
Specification for construction quality checkout and evaluation of electric equipment installation |
765 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 936-2005 |
Guide for overhaul boiler setting and equipment insulation of thermal power plant |
480 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 640-1997 |
Technical conditions for ordering outdoor AC high-voltage drop-out fuse and the fuse-link |
240 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
DL 5061-1996 |
Design code for labour safety and industrial sanitation of water conservancy and hydropower projects |
420 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5435-2009 |
Economic evaluation guidelines for fossil-fired power plant |
900 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
|