Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 1054-2007 |
Technical supervision code for the insulation of high voltage electric equipment |
345 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 441-2004 |
Supervision code for creep strain of steam pipe in high temperature and high pressure in fossil fuel power plant |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 902-2004 |
Technical requirements and test methods of abrasion resistant refractory material |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 862-2004 |
Code of operation management and inspection for transmitters/transducers of non-electric in hydraulic power plant |
375 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 805.4-2004 |
Guideline for cycle chemistry in fossil plants -- Part 4: Feed water treatment |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 741-2001 |
Operating code for overhead transmission line |
465 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 340-2010 |
Guide for circulating fluidized bed boiler start-up and commissioning |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 25095-2010 |
Monitoring system of operating status for overhead transmission lines |
660 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 838-2003 |
Guide of maintenance for power plant equipments |
1260 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 1132-2009 |
Maintaining guide of boiler water circulating pump motor for power station |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 797-2001 |
Code on maintenance of wind farm |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 750-2001 |
Regulations for operation and maintenance of rotary air preheater |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 35729-2017 |
Code of practice for maintenance and test of digital electro-hydraulic control system of steam turbine in fossil fuel power plant |
160 (USD) |
via email in
1 business day
|
VALID
|
|
DL/T 724-2000 |
Specification of operation and maintenance of battery DC power supply equipment for electric power system |
345 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 894-2004 |
Guide of commissioning for ash and slag handling system in power plant |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1228-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 491-2008 |
Code for operating and overhauling of self-shung exciction system equipment of large and medium-sized hydraulic generator |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 748.5-2001 |
Guide of maintenance of boiler unit for thermal power station Part 5 : The maintenance of air & flue system |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 794-2001 |
Chemical cleaning guide for steam power plant |
900 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 939-2005 |
Guide for boiler tube monitoring and inspection in fossil fuel power plant |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|