Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 901-2004 |
Acid-resting materials of chimney lining for fossil fuel power plant |
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1072-2007 |
Rules for in-site periodic tests of pumps in nuclear power plant |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 903-2004 |
Technical guide for surfacing parts of coal pulverizer |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 619-1997 |
Code of operation maintenance overhaul and test for automatic control components and their related systems for hydrogenerating sets |
465 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 1026-2006 |
Quality assurance for maintenance of non-nuclear safety equipment in nuclear power plant |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1025-2006 |
Technical supervision codes for metal in nuclear power plants |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1035.2-2006 |
Guidelines for the Maintenance of Circulating Fluidized Bed Boilers Part2: The maintenance of boiler body |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 440-2004 |
The code of inspection and evaluation for existing boiler drum in fossil-fuel power plants |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 905-2004 |
Technical guide for repair welding of turbine blades |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
CJ/T 534-2018 |
Circulating water pump for swimming pool and SPA pool |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1148-2009 |
Patrol system for power cables |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 35731-2017 |
Code of practice for maintenance and test of distributed control system in fossil fuel power plant |
370 (USD) |
via email in
1 business day
|
VALID
|
|
DL/T 461-2004 |
Guide for operation and the maintenance of electrostatic precipitators for coal-fired power plants |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 934-2005 |
The rules for measuring and evaluating thermal insulation of thermal power plant |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1115-2009 |
Guide for chemistry check-up of unit maintenance in fossil fuel power plant |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
|