Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 805.3-2004 |
Guideline for cycle chemistry in fossil plants -- Part 3: Caustic treatment for drum units |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 748.4-2001 |
Guide ofmaintenance of boiler unit for thermal power station Part 4 : The maintenance of pulverized coal system |
885 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 384-2010 |
Operation specification for 9FA class gas turbine and steam turbine combined cycle unit |
345 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 748.10-2001 |
Guide of maintenance of boiler unit for thermal power station Part 10 : The maintenance of fossil-fired PP FGD equipment |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 35695-2017 |
Technology guide for preventing bird-related outages of overhead transmission lines |
480 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 895-2004 |
Guide of operation for ash and slag handling system in power plant |
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 869-2004 |
The code of welding for power plant |
600 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 837-2003 |
Reliability evaluation code for transmission and distribution installation |
420 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1035.4-2006 |
Guidelines for the Maintenance of Circulating Fluidized Bed Boilers Part4: The maintenance of bottom ash discharge system |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 936-2005 |
Guide for overhaul boiler setting and equipment insulation of thermal power plant |
480 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 1035.5-2006 |
Guidelines for the Maintenance of Circulating Fluidized Bed Boilers Part5: The maintenance of refractory and wearproof layers |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 867-2004 |
Analysis methods on arsenic cadmium chromium copper nickel lead and zinc in fly ash (Atomic absorption spectrometry) |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1081-2008 |
Operating rules of 12kV~40.5kV outdoors higth voltage switchgear |
225 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 932-2005 |
Guide of operation and maintenance for the condenser and vacuum system of power plant |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 435-1991 |
|
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 491-1999 |
Code for operating and overhauling of static rectification excitation system equipment of large and medium-sized hydraulic generator |
330 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 660-2007 |
Test procedure for the viscosity of coal ash in high-temperature |
255 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 956-2005 |
Guide for lay-up of thermal power equipment in fossil fuel power plant |
465 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 1149-2010 |
Guide for operating flue gas limestone/lime-gypsum desulphurization in thermal power plants |
255 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1195-2012 |
Specifications of operation and maintenance for high voltage variable frequency drive used in fossil-fuel power plants |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
|