Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB 50060-2008 |
Code for design of high voltage electrical instrallation(3~110kV) |
930 (USD) |
via email in
1-8 business day
|
VALID
|
|
SD 292-1988 |
|
330 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 50169-1992 |
Code for construction and acceptance of earthed device electric equipment installation engineerin |
270 (USD) |
via email in
1-3 business day
|
|
|
HG/T 21508-1992 |
|
1680 (USD) |
via email in
1-10 business day
|
VALID
|
|
GB 50055-1993 |
Code for design of electric distribution of general-purpose utilization equipment |
525 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
GB/T 50063-2008 |
Code for design of electrical measuring device of power system |
1170 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 5056-2007 |
Technical code of general plan design for substation |
1095 (USD) |
via email in
1-8 business day
|
VALID
|
|
GBJ 63-1990 |
Specifications for the design of electric measuring instrument system |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB 50054-1995 |
Code for design of low voltage electrial installations |
645 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
GB 50056-1993 |
Code for design electrical equipment of electroheat installations |
390 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 50972-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB 50973-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB 50417-2007 |
Code for design of electric power supply of under the coal mine |
720 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
GB 50389-2006 |
Code for construction and acceptance of 750kV overhead transmission line |
975 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
CJJ/T 72-2015 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB 50070-2009 |
|
1155 (USD) |
via email in
1-8 business day
|
VALID
|
|
HG/T 20666-1999 |
Code of electrial design for chemical enterprises in corrosion atmosphere |
720 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB 50169-2006 |
Code for construction and acceptance of grounding connection electric equipment installation engineering |
720 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 621-1997 |
Grounding for AC electrical installations |
390 (USD) |
via email in
1-3 business day
|
|
|
CECS 33-1991 |
THE SELECTION STANDARD FOR SERIES OF VOLTAGE AND CAPACITY OF SHUNT CAPACITOR |
165 (USD) |
via email in
1-3 business day
|
|
|
|