Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GBJ 149-1990 |
Erection works of electrical installations Code for construction and acceptance of bus-bar device |
525 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DBJT 08-1977-1997 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB 50131-2007 |
Code for constructional quality acceptance of automation instrumentation engineering |
1200 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
GB 50170-1992 |
Code for construction and acceptance of rotating electrical matchines electric equipment installation engineering |
330 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY 4205-2016 |
Code for quality acceptance of oil and gas construction engineering. Automation instrumentation engineering |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
HGJ 517A-1991 |
|
1320 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
GB 50257-2014 |
Code for construction and acceptance of electric equipment on fire and explosion hazard electric equipment installation engineering |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
LD/T 76.5-2000 |
Work quota for the instrumentation installation of chemical engineering |
390 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 50976-2014 |
Code for Installation and Acceptance of Protection Equipment and Secondary Circuit in Infrastructure Project |
750 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB 50227-2008 |
Code for design of installation of shunt capacitors |
555 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
GB 50182-1993 |
Code for construction and acceptance of elevators electric equipment of electrical apparatus installation engineering |
705 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
HG/T 21509-1995 |
|
3780 (USD) |
via email in
1-10 business day
|
VALID
|
|
SY 4205-2007 |
Code for quality acceptance of oil and gas construction engineering automation instrumentation engineering |
705 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SH/T 3104-2000 |
Code for the design of instrument installation for petrochemical industry |
660 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
沪J/D 405-2000 |
Recommendatory Universal Drawing 41 for Shanghai Building Product - Installation of ZDX (R)-B(F)-S(W) Series (Lightning Protection) Household Distribution Box |
285 (USD) |
via email in
1 business day
|
VALID
|
|
GBJ 93-1986 |
Specifications for construction and acceptance of industrial automation instrumentation |
480 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
GB 50168-2006 |
Code for construction and acceptance of cable system electric equipment installation engineering |
1035 (USD) |
via email in
1-8 business day
|
|
|
DL/T 5352-2006 |
Technical code for designing high voltage electrical switchgear |
1260 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
HGJ 517B-1991 |
|
2250 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SY 4031-1993 |
Standard for Inspection and Evaluation of Petroleum Construction Engineering Automatic Instrument Installation Engineering |
1710 (USD) |
via email in
1-10 business day
|
|
|
|