Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 393-2010 |
Regulations of condition-based maintenance & test for electric equipment |
960 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 1035.3-2006 |
Guidelines for the Maintenance of Circulating Fluidized Bed Boilers Part3: The maintenance of coal conveying air and flue gas system |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 775-2001 |
Commisioning code for I&C system of ash and slag in fossil fuel power plant |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
T/CEC 142-2017 |
Guide of operation for on-line monitoring device of gases dissolved in transformer oil |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1703-2017 |
Guide for condition evaluation of metal oxide arrester |
225 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 801-2002 |
Requirements of quality and internal cooling water system for large generator |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 741-2010 |
Operating code for overhead transmission line |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1066-2007 |
Guide of maintenance management for hydropower station equipments |
510 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 1246-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 737-2000 |
The operated management standard of unattend-substation for the rural electric power network |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 752-2010 |
The code of the welding on dissimilar steel for power plant |
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 983-2005 |
Rules of steam moisture measurement for nuclear power plant |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1113-2009 |
The inspection code of pipe hangers and supports for power plants |
390 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 964-2005 |
Performance test code for circulating fluidized bed boiler |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 982-2005 |
Maintenance & adjustment guide for nuclear power plant steam-water piping and supports |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 863-2004 |
Guide for turbine start-up commissioning test |
705 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 362-2010 |
Operation evaluation technical regulation of environmental protection equipment for coal-fired power plant |
330 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 748.7-2001 |
Guide of maintenance of boiler unit for thermal power station Part 7 : The maintenance of ash and slang handling system |
345 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1092-2008 |
General conditions of security and stability control system for power system |
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 966-2005 |
Technical guider for live working in transmission line |
270 (USD) |
via email in
1-3 business day
|
VALID
|
|
|